
Bathroom Remodeling Belgrade, ME: Built to Work in February
- Newman Homes remodels bathrooms in Belgrade, ME, along the lakes chain, especially in camps used beyond summer.
- We’re based in Augusta, about twenty minutes away. We’ve worked on these lakes since 2017.
- Before starting the company, Brandon Roberge spent more than 25 years building custom homes in Florida and Massachusetts.

- 25+ years in construction, building as Newman Homes since 2017
- Over 200 projects completed in Central Maine
- Affordable work, two-year written warranty
Bathroom remodeling in Belgrade, Maine, priced per bathroom, across the Belgrade Lakes chain and the village.
Camp conversions almost always need a second bathroom, and a second bathroom is not a second copy of the first. It needs a vent stack, drain routing that works with what is already there, and a septic system that can carry the extra load.
Those three answers come before any tile is chosen. A small bathroom with basic updates starts at $12,000; the gut band with extensive tile runs $25,000 to $35,000.
Finish Levels, and What Each Buys
Selections account for most of the price difference between two similar rooms.
For a converted camp, we’d spend first on the heated floor and valve quality, not the vanity. Those are the two things you’ll notice in January.
Builder grade. A stock vanity, molded tub and surround, ceramic tile, standard valves. The fastest route to a usable bathroom.
Mid range. A semi-custom vanity, porcelain on floor and walls, a tiled shower with glass, quartz counter, name-brand valves.
High end. A custom vanity, stone or large-format porcelain, curbless or fully tiled shower, designer trim, heated floor.
What homeowners say
Read more reviews- ★★★★★
Great company to work with. Very communicative and quick with the work.
Michael M. - ★★★★★
It has been near 5 years since moving into this Newman built home. And, I still absolutely love it. The construction took place during a difficult time in my life, and Brandon was always available to guide me.
David D.custom home - ★★★★★
Brandon and the team at Newman Homes did a great job at expanding my one car garage to a two car garage. They did exactly what I wanted, and then some.
Mark B.garage project
Get your free estimate request sent in 60 seconds
Answer a few quick questions about your Belgrade project. No pressure, no obligation, just a straight answer on cost and timeline.
Related Services in Belgrade

What the Job Includes Here
The work may start with demolition, followed by floor and framing repair. It can also cover insulation, line rerouting, plumbing rough-in and electrical rough-in.
Then comes waterproofing, tile, fixtures and a 2-year workmanship warranty.
Elijah prices the room and runs the site. We run the schedule, sending photos twice a week.
Joe handles the town filing and the scaled site plan required for the permit. Brandon reviews structural work, then walks the finish.
You sign once. We coordinate the job.

Where We Work Around Belgrade
We work in Belgrade Lakes village and along the Great Pond and Long Pond shorelines. Our service area also covers the Messalonskee side and roads toward Sidney and Vienna.
Every one of these properties uses a private system. The Maine Subsurface Wastewater Disposal Rules determine whether another fixture can be added.
Camp roads are often narrow and privately maintained. Material delivery belongs in the estimate from the start.

When to Schedule Belgrade Bathroom Work
Allow three to eight weeks of lead time. Shoreland or septic review may take longer.
Permits go through Belgrade Code Enforcement, which requires a site plan drawn to scale.
Interior work continues all winter, when lake roads are quieter. Frankly, it’s the easiest time to get a crew here.
Why the Quoted Price Holds
We track the numbers and report the misses. Of 200+ completed projects since 2017, 94 percent finished on the original timeline and budget.
We measure that monthly.
A cheap camp-bathroom quote usually means nobody checked where the pipes run. We think that’s a bad gamble.
We inspect before pricing. And any genuine change becomes a written change order for your approval first.
Who We Work For in Belgrade
We work with owners converting a camp. We also fix bathrooms that owners regret after a conversion.
Great Pond. Long Pond.
Messalonskee. Salmon Lake, McGrath Pond and North Pond.
The buildings differ. The plumbing story rarely does.
Seasonal camps were built to be drained in October. Supply lines often run where installation was convenient, rather than where they’ll stay warm.
Fix that first. Tile comes second.
Ninety-four percent of our projects finish on the original timeline and budget. We recalculate the figure monthly.

How Much a Bathroom Remodel Costs in Belgrade
Every figure below is per bathroom. Two rooms means two projects. A small bath with straightforward updates generally starts in the $12,000 range. Better finishes in the same footprint can bring it close to $20,000. A medium bathroom usually costs about $15,000. At the upper end of that scope, expect $20,000 to $22,000. Larger bathroom updates range from $18,000 to $25,000. If damage requires a full gut plus extensive tile work, add $8,000 to $10,000. The resulting project range is $25,000 to $35,000. Six factors determine where your project lands. We settle all six before quoting. The estimate breaks out costs by trade.

Vent stack.
Seasonal venting often will not pass for year-round use.
Subfloor.
Camp floors are commonly thin and springy, which tile will not tolerate.
Rot.
Frequent in buildings that sit closed and damp through the shoulder seasons.
Moving plumbing.
On a lake lot, relocating a fixture can trigger a septic review as well as a cost.
Tile versus surround.
A tiled shower carries far more labor than a one-piece unit.
Septic capacity.
On the lakes chain this is the first question anyone should ask.
How to Hire for Bathroom Remodeling Belgrade, ME
Here’s something lake-country builders tend to leave off the sign: Maine has no state licensing standard for general contractors or builders.
The trades are credentialed. Licensed plumbers and electricians hold state certificates.
They complete the rough-in on your job.
Ask the company running the project these five questions.
Ask everyone the last one. On this chain of lakes, it predicts your next ten winters.
A fixed price with the trades separated out, written to Maine's home construction contract statute, which keeps your first payment at or under a third of the total.
Insurance certificates for the builder and every sub, sent to you directly.
Tile and fixture allowances written into the contract.
Ours is 2 years, alongside an A+ BBB record.
A written plan for keeping supply and waste lines inside conditioned space.
Where is our shop?
Directions from Belgrade, ME to our shop in Augusta
125 Community DrAugusta, ME 04330-8156

What a Belgrade Bathroom Job Actually Looks Like
- We look before we price.A lot of Belgrade bathrooms started life in a camp that later got winterised, so the floor, the flange, the stack and whatever sits under the tub all get checked before a number goes on paper.
- Everything itemized in writing.Fixtures, tile, vanity, glass, plumbing, electrical, and a stated allowance for the subfloor and framing repair nobody can see yet.
- Tear-out, then whatever is behind it.Rot, a soft subfloor or a failed flange all price at the agreed unit rate rather than a new number.
- Rough plumbing and electrical, inspected.Then waterproofing, which is the step that decides whether the tile lasts ten years or three.
- Then tile, fixtures, glass, trim.Shower glass gets templated off the finished tile, so it is the final delivery on every job.
- We finish on a written list, not a handshake.Worked to zero, then a 2-year workmanship warranty.

Start a Belgrade Bathroom Project
Call (207) 480-7700. Brandon usually answers, and the line is covered around the clock.
Email photos and the property address to info@newmanhomesme.com, or request an estimate.




