General Contractor Belgrade, ME: Turning Seasonal Camps Into Year-Round Homes
- Newman Homes is the general contractor Belgrade, ME owners call when a lake property needs real construction rather than another season of patching.
- Our shop is in Augusta, about twenty minutes out, and we have worked the Belgrade Lakes chain since 2017.
- Brandon Roberge built custom homes in Florida and Massachusetts for 25+ years before bringing that work to Kennebec County.

- 25+ years in construction, building as Newman Homes since 2017
- Over 200 projects completed in Central Maine
- Affordable work, two-year written warranty
General contracting in Belgrade, Maine, about twenty minutes from the Augusta shop, covering the village and the whole Belgrade Lakes chain.
Lake properties generate a particular kind of project: the year-round conversion. Heating a building that was built for July, insulating walls that have none, and adding the space that makes it work in February. That is general contracting rather than a single trade.
Access and season both matter more here. Camp roads limit what can be delivered, and the useful working window is shorter than the calendar suggests. Additions run $280 to $400 a square foot turnkey.
Additions in Belgrade, Broken Out by Type
Nearly every addition here starts with the same question: will what is under the building carry a year-round room.
Every one of the six is quoted as a fixed price with itemized costs before work starts.
Attached garage additions. Camp lots slope toward the water and the road frontage is often narrow, so the garage usually goes on the uphill side with a regraded approach and a frost wall.
Kitchen additions. Seasonal service panels were never sized for year-round cooking and heating, so licensed electricians establish the real capacity before design gets far.
Bathroom additions. On the lakes chain a new fixture group is a septic question first and a plumbing question second, and licensed plumbers work with the town on both.
Great room additions. Opening a camp toward the water usually means replacing walls that were framed light, so the header, posts, and new footings get designed as one system.
Sun room additions. Four-season use over old pier supports is the most common mistake we get called to fix, and the honest answer is a proper foundation underneath.
Porch additions. Footings reach below frost depth, and near the shoreline erosion control goes in before excavation rather than after.
What homeowners say
Read more reviews- ★★★★★
Brandon was always very fair with any adjustments to our fixed price contract, and we were quite happy with the outcome.
David K.remodeling client - ★★★★★
I was very impressed with the promptness and professional completion of the job. I have no complaints. Great company.
Marcia A. - ★★★★★
Great company to work with. Very communicative and quick with the work.
Michael M.
Get your free estimate request sent in 60 seconds
Answer a few quick questions about your Belgrade project. No pressure, no obligation, just a straight answer on cost and timeline.
Related Services in Belgrade

What We Take On
The estimate, the contract, the permit, the subs, daily supervision, and a 2-year workmanship warranty on the work.
Elijah writes the price and runs the site. We hold the schedule, and you get photos twice a week.
Joe handles the town filing and the site plan the permit requires. Brandon reviews the drawings and walks the finished job.
You sign one contract, and the coordination stays with us.

Where We Build Around Belgrade
Belgrade Lakes village, the Great Pond and Long Pond shorelines, the Messalonskee side, and the roads out toward Sidney and Vienna.
Shoreland zoning governs most waterfront work on the chain, and it sets the timeline more than any other factor.
Camp roads are narrow and often privately maintained, so truck size and crane placement get planned before the schedule is promised.

When to Book Belgrade Work
Four to twelve weeks of lead time, and add to that if shoreland review applies.
The permit goes through Belgrade Code Enforcement, which requires a site plan drawn to scale with the application.
Access is best from late spring through fall, and that season fills first. Interior work carries through the winter.
Why the Price Is Dependable
Because we keep score. Ninety-four percent on the original timeline and budget, tracked monthly, over 200+ completed projects since 2017.
Camp conversions are the classic place for a low bid to fall apart, because the foundation problem is under the building where nobody looked.
We look before we price. If something real changes, it becomes a written change order you approve first.
Who Calls Us in Belgrade
Mostly people who inherited or bought a camp and now want to live in it.
Great Pond, Long Pond, Messalonskee, Salmon Lake, McGrath Pond, North Pond. Different water, same building problem.
These structures were built to be closed in October. Making one work in February is a different building, not a renovation.
We would rather tell you that at the estimate than discover it in November.
Ninety-four percent of what we build finishes on the original timeline and budget. That number is recounted monthly.

How Much a Belgrade Project Costs
Additions run from about $280 per square foot at the entry end to roughly $320 on an average job. Higher-end finishes reach $350 to $400. Camp conversions frequently sit above that, because you are buying a foundation, an envelope, and mechanical systems the building never had. Shoreland permitting, narrow access, and winterizing an existing structure are the three things that move a Belgrade budget. We assess the building before quoting and hand you a breakdown by trade, so you can decide what happens now and what waits. For new builds, see our Maine home building cost guide.

How to Hire a General Contractor Belgrade, ME
Start with something the lake-country builders rarely volunteer: Maine has no state licensing standard for general contractors or builders.
Electricians and plumbers carry state credentials. Builders carry a contract, which is why the contract deserves your attention.
Ask all five of these.
That list costs you one conversation and can save you a year.
A fixed-price agreement broken out by trade, written under Maine's home construction contract statute, which caps the initial down payment at 1/3 of the price.
Insurance certificates for the builder and each subcontractor, delivered to you.
A written schedule and photo updates you do not have to drive out to get.
Ours is 2 years, with an A+ BBB record behind it.
Work that meets the Maine Uniform Building and Energy Code.
Where is our shop?
Directions from Belgrade, ME to our shop in Augusta
125 Community DrAugusta, ME 04330-8156

The Order We Work In on a Belgrade Job
- We start on your lot, not in an inbox.Belgrade camp roads are narrow, and equipment access is a real line on the estimate, and that shapes the plan before any pricing happens.
- The contract is itemized before anyone swings a hammer.Trades, allowances and unit rates all named, with the first payment at or under the one third Maine law allows.
- We file the permit.The town's code enforcement officer decides, not us, and we build the schedule around their timeline rather than promising one.
- One trade at a time, in the right order.Site work, foundation, framing, roof, then close-in, because stacking crews is how quality and schedule both slip.
- Change orders in writing, always.You see the cost before the work, not on the final bill.
- Walkthrough, punch list, warranty.Written list worked to zero, then 2 years of workmanship coverage.

Start a Belgrade Project
Call (207) 480-7700. Brandon usually answers, and the line is covered at any hour.
Email info@newmanhomesme.com with the property address and a short description, or request an estimate.