Kitchen remodeling in progress in a Central Maine home

Local Kitchen Remodeling | Newman Homes

Kitchen remodeling is the project homeowners research the longest, yet useful pricing is scarce because almost nobody in this market publishes a number. That’s a failure.

  • 25+ years in construction, building as Newman Homes since 2017
  • Over 200 projects completed in Central Maine
  • Affordable work, two-year written warranty

What a kitchen remodel costs with Newman Homes in Central Maine, sorted into five bands from a cosmetic refresh up to a full layout change with a wall taken out.

There is no price per square foot on this page and there will not be one. Kitchen cost is driven by cabinet run, appliance count, and how much plumbing and electrical has to move. None of those scale with floor area, so a per-foot number would be a guess dressed up as a rate.

The number to leave with is the floor: $28,000. Below that you are looking at a partial update rather than a kitchen remodel, and Newman Homes would rather say so than write a price it cannot build to.

What Belongs in the Contract

Maine has no state licensing standard for remodeling contractors. Electrical and plumbing work does require a state credential.

Your contractor should hold one you can look up.

  • The cabinet line named by manufacturer and door style, not just by tier.
  • A written allowance for counters and appliances, with the number you are budgeting to.
  • A structural opinion in writing on any wall coming out, before the price is final.
  • A fixed price under Maine's home construction contract law, with the first payment held to one third.
  • Lead-safe work practice on a pre-1978 house, under the federal renovation rule.
  • A 2-year workmanship warranty, written, backed by our A+ BBB profile.
Semi-custom cabinets being set in a renovated Maine kitchen

What homeowners say

Read more reviews
  • ★★★★★

    We were very pleased with the extensive home remodel we contracted with Newman Homes. Brandon was always very fair with any adjustments to our fixed price contract, and we were quite happy with the outcome.

    David K.
  • ★★★★★

    …found Brandon to be knowledgeable, responsive, and professional. We highly recommend Newman Homes and plan to use them in the future.

    Dawn R.
  • ★★★★★

    I was very impressed with the promptness and professional completion of the job. I have no complaints. Great company.

    Marcia A.

What a Kitchen Costs

ScopeRange
Cosmetic refresh, layout unchanged. Refaced or stock cabinets, new counters, sink, backsplash, floor, lighting$28,000 floor
Standard gut. Semi-custom cabinets, quartz counters, new flooring and lighting, sink and range stay put$46,000 to $58,000
Gut plus plumbing moved, no wall removed$60,000 to $80,000
Layout change. Wall out with a beam, sink or range moved, island added with power$85,000 to $105,000
Custom cabinetry and stone counters on top of a layout changeadd $15,000 to $25,000

Each of the five figures is a qualifying range averaged across hundreds of estimates. Real kitchens land near a band, rarely right on it. The $28,000 floor is firm. Below that, you’re looking at a partial update instead of a kitchen remodel. We’d rather say so than publish a figure we cannot deliver. There is no kitchen price per square foot, and we will not publish one. Cabinet run and appliance count drive cost. So does the amount of plumbing or electrical work that moves. None of it scales with floor area. Our kitchen cost guide explains all five bands in detail.

Quartz counter being templated in a Maine kitchen renovation

How Kitchen Remodeling Runs

  1. Measure and look underneath.

    The panel, the plumbing, the floor level, and what is above the wall you want opened.

  2. Design and cabinet selection.

    Layout first, then the box tier, then everything else. Design practice standards are published by the national kitchen and bath association.

  3. An itemized contract.

    Cabinets, counters, appliances, plumbing, electrical, flooring, and allowances, each on its own line.

  4. Demolition and structure.

    Anything touching the frame happens first, with temporary support in before a wall comes out.

  5. Rough mechanicals, inspection, then close in.

    Wiring and plumbing get inspected before board goes on.

  6. Cabinets, counters, tile, trim.

    Counters template after cabinets are set, which is why there is a gap in the middle of the schedule.

  7. Punch list and warranty.

    Written, worked to zero, then 2 years of workmanship coverage.

What Moves the Number

Cabinets are the single biggest line and the main thing you control. Stock, semi-custom, and custom is a real ladder, and moving up one rung changes the total more than any counter material will.

Whether the sink and range stay put. Moving plumbing and gas is the expensive change. Moving cabinets is not.

Whether the wall somebody wants removed is carrying the floor above it. A structural opening means a beam, posts, and a load path down to the foundation, and that is the jump from the $60,000 band to the $85,000 one.

What the electrical service can support. A modern kitchen needs dedicated circuits, and pre-1960 houses in this service area routinely still have knob-and-tube wiring and an undersized panel.

Below the five bands are the older-house problems we see constantly here. Pre-1900 houses often have out-of-level floors.

Layered flooring may bring lead or asbestos considerations, while sink walls can hide subfloor rot. Existing openings may not fit new appliances.

Rural lots add questions about well water chemistry. And a dishwasher or disposal can strain a septic system that never served either one.

We publish five broad price bands on this page. In under a minute, they’ll show whether the kitchen you have in mind fits your budget.

Newman Homes has worked out of Augusta since 2017 under Brandon Roberge. He has 25+ years in the trade, first across Florida and Massachusetts, then in Maine.

Recounted monthly, 94% of our projects finish on the original schedule at the original number.

Load-bearing wall opened with a beam between a kitchen and dining room

Common Questions

Most projects run four to ten weeks depending on band, and the cabinet lead time is usually the longest single item.

Finished kitchen in a Central Maine home, wide interior view

Talk About Your Kitchen

Call (207) 480-7700. Someone answers around the clock, most often Brandon.

Or write info@newmanhomesme.com, or request a free estimate.