Cost to Remodel a Kitchen in Augusta, ME: The 2026 Bands
What a kitchen remodel costs in Augusta, Maine, sorted into five bands from a cosmetic refresh through to a layout change with a wall removed and an island added.
Each band names what is actually in it: cabinet grade, counter material, whether the sink and range stay where they are, and whether anything structural moves. That is the honest way to compare quotes, because two kitchens at the same price can be doing completely different amounts of work.
The guide refuses a price per square foot and explains why. Cost here is driven by cabinet run, appliance count and how much plumbing and electrical moves, and none of those track floor area.
- 25+ years in construction, building as Newman Homes since 2017
- Over 200 projects completed in Central Maine
- Affordable work, two-year written warranty

A kitchen remodel in Augusta, ME starts at $28,000 for a cosmetic refresh. Remove a wall and change the layout, and the cost reaches $85,000 to $105,000.
Updated for 2026.
Five price bands cover almost every kitchen project in this market. Find yours.
The rest of this guide explains what would push the project into the next band.
For details about the work itself, see kitchen remodeling.
Each of the five bands reflects hundreds of estimates. Real kitchens land near a band, rarely right on it.
Cost to Remodel a Kitchen in Augusta, ME by Scope
| Scope | Range |
|---|---|
| Cosmetic refresh, layout unchanged. Refaced or stock cabinets, new counters, sink, backsplash, floor, lighting | $28,000 floor |
| Standard gut. Semi-custom cabinets, quartz counters, new flooring and lighting, sink and range stay put | $46,000 to $58,000 |
| Gut plus plumbing moved, no wall removed | $60,000 to $80,000 |
| Layout change. Wall out with a beam, sink or range moved, island added with power | $85,000 to $105,000 |
| Custom cabinetry and stone counters on top of a layout change | add $15,000 to $25,000 |
The $28,000 figure is a hard floor. It isn’t a starting point to negotiate below.
Spend less and you’re doing a partial update, which is a legitimate but different project.
There is no reliable kitchen price per square foot. I wouldn’t trust anyone who quotes one.
Cost follows the length of the cabinet run and the appliance count. It also changes when plumbing or electrical work moves.
Floor area doesn’t track any of that.
Where the Money Actually Goes
On a standard gut remodel, cabinets lead the budget by a wide margin. Labor comes next, followed by counters, appliances, flooring, lighting and trim.
Cabinets are the biggest line and the one you control most. Stock, semi-custom, and custom is a real ladder, and moving up a rung changes the total more than any counter material will.
Counters are the decision people overweight. The difference between a good quartz and a premium stone is real, and it is smaller than the difference between stock and custom boxes.
The Three Things That Move You Up a Band
1. Whether the sink and range stay put. Moving plumbing and gas is the expensive change, and it is the boundary between the $46,000 band and the $60,000 one. Moving cabinets is not expensive.
2. Whether the wall is carrying the floor above. A structural opening means a beam, posts, and a load path down to the foundation. That is the jump into the $85,000 band.
3. What the electrical service can support. A modern kitchen needs dedicated circuits, and pre-1960 houses around Augusta routinely still have knob-and-tube wiring and an undersized panel.
What Older Augusta Houses Turn Up
The capital-area housing stock is old enough that these are ordinary findings, not disasters:
- Out-of-level floors in pre-1900 houses, which show up when cabinets get set
- Layered flooring with lead and asbestos considerations underneath
- Subfloor rot at the sink wall
- An appliance opening that will not take a modern range or refrigerator
- Septic capacity on a rural lot where a dishwasher and disposal are being added to a system that never had them
Each one should have a written allowance and unit price in your contract.
Finding them is normal. Making up the price afterward isn’t.
What a Realistic Timeline Looks Like
Most projects take four to ten weeks. Cabinet lead time is usually the longest single item, not labor.
The sequence is demolition, structure, rough plumbing and electrical, inspection, board and floor, cabinets, counters, tile and trim.
Counters are templated after the cabinets are set. That creates a gap in the middle of every kitchen schedule, so nobody should promise a continuous crew.
What Belongs in the Contract
Maine has no state licensing standard for remodeling contractors. Electrical and plumbing work does require a state credential.
Whoever performs that work should hold a credential you can look up.
- The cabinet line named by manufacturer and door style, not just by tier.
- A written allowance for counters and appliances, with the budget figure stated.
- A structural opinion in writing on any wall coming out, before the price is final.
- Lead-safe work practice on a pre-1978 house, under the federal renovation rule.
- A fixed price under Maine's home construction contract law, which holds the first payment to one third.
Kitchen design practices and clearance standards are published by the national kitchen and bath association. Read the clearance rules if you plan to move anything.
Common Questions
Is refacing worth it?
If the boxes are sound and the layout works, yes. That is exactly why the $28,000 refresh band exists.
How long will I be without a kitchen?
Plan on the full project length for the sink and range, and set up a temporary kitchen somewhere else in the house on day one.
Can we open the wall into the dining room?
Usually. What decides it is what the wall is carrying, and the beam gets sized before the job gets priced.
Should I buy my own appliances?
It is fine, and tell your contractor the exact models before the cabinet order goes in rather than after.
Get a Real Number
The five bands show whether the kitchen you want fits your budget. An exact number requires someone to inspect the panel and plumbing, plus whatever sits above the wall.
Call (207) 480-7700 or email info@newmanhomesme.com. A free estimate is the fastest place to start.
Every project includes a written 2-year workmanship warranty.